The Ministry of New and Renewable Energy funds startups through time-limited calls with the National Institute of Solar Energy, covering RE start-up incubation and Green Hydrogen pilot projects.

About Ministry of New and Renewable Energy (MNRE)

The Ministry of New and Renewable Energy (MNRE) is the Government of India ministry with responsibility for solar, wind, green hydrogen and other renewable energy. It is neither an incubator nor a standing startup fund, and the bulk of its programmes are directed at households, utilities and large manufacturers. What matters to founders is a limited set of calls for proposals, issued through the National Institute of Solar Energy (NISE), aimed at DPIIT-recognised start-ups working on renewable energy technology.

MNRE does not keep an always-open application window for startups. Start-up support arrives as calls for proposals with a fixed closing date. Two such calls were identified: the NISE Start-up Incubation in Renewable Energy (RE) Sector call, issued in June 2025 and revised by a corrigendum in August 2025, and the National Green Hydrogen Mission call for pilot projects from start-ups, issued in 2025. Both closing dates have passed, so no intake is open for applications at present. New calls and corrigenda are published on mnre.gov.in, which is where a repeat call should be watched for.

The incubation call is run by NISE together with the National Solar Energy Federation of India (NSEFI) and the Atal Incubation Centre at IIT Delhi Sonipat Innovation Foundation, Haryana. It supports start-ups for an initial two years, extendable by up to one further year in two steps of six months each, subject to a performance review. The Green Hydrogen call is Part B of a pilot-projects scheme under the National Green Hydrogen Mission and invites pilot proposals from start-ups developing new Green Hydrogen production or use technologies; support takes the form of financial assistance for the pilot, capped at a share of the total equipment cost.

Both calls are restricted to start-ups recognised by the Department for Promotion of Industry and Internal Trade (DPIIT), and both require a solution at Technology Readiness Level (TRL) 3 to 4 — a proof of concept or a lab-validated prototype with a clear path to TRL 6 to 8, the market-ready stage. For the incubation call, the start-up must be an Indian entity under the Companies Act, 2013, with at least 51% of its shares held by Indian promoters at the time of application. For the Green Hydrogen call, the start-up must be a private limited company, a partnership or an LLP, must be less than 10 years old, must stay under a turnover ceiling set in the call, and must intend to set up a Green Hydrogen pilot project in India. A start-up that has applied for DPIIT recognition but does not yet hold it may apply, though funding is released only after recognition comes through. Pre-prototype ideas below TRL 3 do not fit the stage these calls describe.

For the incubation call, the original notice asked applicants to complete the application form, convert it to PDF and email it with all enclosures to incubation@nise.res.in before the closing date; a later corrigendum revised the call, so the current notice on mnre.gov.in should be read for the exact submission route before anything is sent. For the Green Hydrogen call, proposals went by email to hydrogen@nise.res.in in the format given in the call, and the call stated that any other means of application would not be considered.

On its homepage MNRE reports that India's installed solar capacity has grown from about 2.8 GW in 2014 to about 164.6 GW, and that wind capacity has grown from 21 GW to about 58.1 GW. It also reports that about 54.4% of installed power capacity now comes from non-fossil sources. These are the ministry's own figures for the country's energy system, not a count of startups it has supported; MNRE does not publish a startup count on the pages checked.

MNRE is part of the Government of India. NISE is the institute through which the start-up calls above were issued, and it receives the applications. The ministry's website is mnre.gov.in. Our catalogue also lists the ministry's household rooftop solar scheme, PM Surya Ghar Muft Bijli Yojana; it is aimed at households rather than startups, so it is not a startup route, though those building for households, such as installers or financing products, should read the scheme page on its own terms.

Subsidy schemes

SubsidyCentral governmentOpen for applications

PM Surya Ghar Muft Bijli Yojana — MNRE Rooftop Solar

Ministry of New and Renewable Energy (MNRE)

Central subsidy and net-metering are available for rooftop solar installations on residential and MSME premises.

Deadline
Rolling
SubsidyCentral governmentClosed

Production Linked Incentive (PLI) Scheme for High Efficiency Solar PV Modules

Ministry of New and Renewable Energy (MNRE)

MNRE's PLI scheme pays competitively selected solar module makers an incentive on high-efficiency PV module sales for five years after commissioning; both tranches are awarded.

Deadline
Not specified

Pli · Production Linked Incentive · Solar · Solar Pv Modules

Contact

Details last verified on 6 October 2026. Source: the issuer's published information.