Assam reimburses Rs 2 per APDCL unit consumed for five years, up to Rs 50 lakh yearly, for eligible consumers.

Open, rolling. Applications are accepted continuously — there is no deadline.

Key facts

Subsidy amount
Up to ₹50,00,000
Instrument
Subsidy
Deadline
Rolling
Disbursement
Reimbursed after spend

About this scheme

Under Clause 14.1(i) of the Industrial and Investment Policy of Assam, 2019, units engaged in manufacturing and in the specified services are entitled to a power subsidy of **Rs 2.00 per unit of electricity consumed**. This benefit runs for five years, counted from the date commercial production begins.

Two ceilings apply. The subsidy cannot exceed **Rs 50 lakh per annum**, and the total benefit over the period cannot go beyond 100% of the investment made in plant and machinery. Whichever of the two limits is reached first will govern.

Eligibility is restricted to electricity consumed through an APDCL (Assam Power Distribution Company Ltd) connection. Power obtained via open access, captive generation, or any other source does not qualify and is expressly excluded.

Who can apply

Eligible business forms
Not specified
Udyam registration
Not specified
MSME registration
Not specified
DPIIT startup recognition
Not required
GST registration
Not specified
Where the business may be based
Assam

- Unit must operate in the manufacturing sector or in a specified services sector in Assam - An electricity connection with APDCL is mandatory - Units drawing power through open access, captive generation or any other source are not eligible - The benefit is available for five years starting from the date of commercial production - The cumulative subsidy is capped at 100% of the investment in plant and machinery

How to apply

- Enrol the unit with the Department of Industries & Commerce under the Industrial and Investment Policy of Assam, 2019. - Confirm that the electricity connection stands in the unit's name with APDCL. - Note the date of commercial production, since the five-year window begins from that date. - File claims at regular intervals, attaching APDCL bills, payment receipts and evidence of investment in plant and machinery. - Applications are submitted via the state single-window / EODB Assam channel.

Apply on the issuer's site

How applications are assessed

There is no competitive selection involved. Before any reimbursement is released, the department checks the unit's APDCL consumption records, the date on which commercial production began, and the amount invested in plant and machinery. These checks are carried out to ensure the payment stays within the annual and cumulative ceilings.

Frequently asked questions

How much is the subsidy?

The reimbursement is Rs 2.00 for every unit of electricity consumed by the unit.

How long does it run?

The subsidy applies for a period of five years, counted from the date on which commercial production begins.

Is there an annual ceiling?

Yes, the cap is Rs 50 lakh per annum, subject to an overall ceiling of 100% of the amount invested in plant and machinery, whichever is lower.

Does captive generation count?

No. Eligibility is limited to electricity consumed through an APDCL connection; open access and captive generation do not qualify.

Who can claim it?

The Assam policy applies to units in the manufacturing sector as well as those in specified services sectors.

Is it paid in advance?

No, the scheme reimburses electricity that has already been consumed and billed.

Sectors

  • Manufacturing Industrial
  • Assam
  • Power Subsidy
  • Electricity
  • Manufacturing
  • Operating Cost
  • State Policy

Details last verified on 6 October 2026. Source: the issuer's published information.