Gujarat Textile Policy: Assistance for Saving in Consumption of Energy and Water
Industries and Mines Department, Government of Gujarat · Central government
Gujarat Textile Policy aid for industrial units cutting energy and water use, via audit reimbursements and equipment cost support.
Opening soon. The issuer has not announced an opening date.
Key facts
- Subsidy amount
- Up to ₹20,50,000
- Instrument
- Subsidy
- Deadline
- Not specified
- Disbursement
- Reimbursed after spend
- Scheme duration
- 5 years
About this scheme
The Industries and Mines Department, Government of Gujarat, operates the Gujarat Textile Policy, an umbrella scheme covering the textile sector. It seeks to draw investment into textiles and reinforce the full value chain, with garments, apparel and technical textiles receiving particular attention. The policy runs from 1 October 2024 to 29 September 2029. Its stated aims include lowering the textile sector's carbon footprint, supporting green growth, and improving both global competitiveness and environmental sustainability.
One component of the policy, "Assistance for Saving in Consumption of Energy and Water," extends financial support to industrial units already in operation as well as to new ones. The support is intended to encourage and enable concrete reductions in energy and water use. Under this component, part of the cost of energy and water audits carried out by recognised institutions or consultants is covered, along with part of the cost of buying the equipment those audits recommend. Through this assistance, the policy promotes efficient use of resources and a shift towards more sustainable ways of operating within the textile industry.
Who can apply
- Eligible business forms
- Private limited company, Limited liability partnership, One person company, Partnership firm, Sole proprietorship
- Udyam registration
- Not specified
- MSME registration
- Not required
- DPIIT startup recognition
- Not specified
- GST registration
- Not specified
- Where the business may be based
- Gujarat
- Existing and new industrial units are both eligible. - The unit must carry out specified measures to lower energy and water consumption. - To qualify for assistance towards equipment cost, the unit must have cut energy or water consumption by at least 10% during the 12 months preceding the audit.
How to apply
- **Registration application:** Forward the completed application in the prescribed format to the Industries Commissioner, attaching every document required. The deadline is one year counted from whichever of these falls last: the date the loan was disbursed, the date production commenced, or the date the policy came into force. - **Issue of registration certificate:** Once the application reaches the Industrial Commissioner, all supporting documents are examined and verified. A registration certificate is granted after verification is completed satisfactorily. - **Provisional/final eligibility certificate application (after DoCP):** Once the 'Date of Commercial Production' (DoCP) is received: - **MSME units having GFCI of up to INR 10 Crore:** Lodge the application with the General Manager, District Industries Center. - **MSME units having GFCI above INR 10 Crore and up to INR 50 Crore:** Lodge the application with the MSME Commissioner for a Provisional Eligibility Certificate. The deadline is 1 year from DoCP or 1 year from the date the Government Resolution (GR) was issued, whichever falls later. - **Units other than MSME:** Lodge the application for a Provisional Eligibility Certificate with the Industries Commissioner. The deadline is 1 year from DoCP or 1 year from the date the registration certificate was issued, whichever falls later. - Make sure every document needed is readied and filed in line with the guidelines that apply to your unit type and investment size.
How applications are assessed
Applications and supporting documents are examined and verified by the Industries Commissioner or the concerned authority — the General Manager, District Industries Centre, or MSME Commissioner. Assistance is granted only where the unit satisfies the prescribed criteria: a commitment to reducing energy or water use and, in the case of equipment assistance, proof of a 10% fall in consumption during the 12 months before the audit. Certificates or assistance are released once the application is found to conform to policy guidelines.
Frequently asked questions
What is the primary objective of this scheme?
The scheme provides financial assistance for energy and water saving initiatives, with the objectives of increasing investment in the textile sector, reinforcing its value chain, encouraging green growth and lowering its carbon footprint.
What kind of financial assistance is provided?
The scheme provides two forms of support: 75% reimbursement for energy and water audits, capped at ₹50,000, and 25% assistance towards the cost of recommended equipment, capped at ₹20,00,000.
Who is eligible to apply?
In Gujarat, textile industrial units — whether already operating or newly established — can qualify if they adopt specified measures to cut down their energy and water use.
Is there a minimum reduction target for energy/water consumption?
Eligibility for equipment cost assistance requires the unit to have cut its energy or water consumption by at least 10% during the 12 months preceding the audit.
How long is this policy component effective?
The component of the Gujarat Textile Policy runs from 1 October 2024 until 29 September 2029.
Where can I find the application form?
Registration applications go to the Industries Commissioner in the prescribed format, which can be downloaded as a PDF. The process is generally offline.
Sectors
- Manufacturing Industrial
- Gujarat
- Textile
- Energy Efficiency
- Water Conservation
- Sustainability
- Msme Support
Details last verified on 14 September 2026. Source: the issuer's published information.