MySubsidy

J&K New DG Set Subsidy

Industries & Commerce Department, Government of Jammu & Kashmir · Central government

A 100% subsidy funds a new 10KW–2000KW DG set for eligible applicants, capped at Rs 40 lakh in Zone A and Rs 45 lakh in Zone B.

Open, rolling. Applications are accepted continuously — there is no deadline.

Key facts

Subsidy amount
Up to ₹45,00,000
Instrument
Subsidy
Deadline
Rolling
Disbursement
Reimbursed after spend

About this scheme

Under the J&K Industrial Policy 2021-30, industrial, commercial and institutional units can receive a full subsidy on backup power.

The incentive covers 100% of the cost of a new DG set of 10KW to 2000KW, subject to a ceiling of Rs 40 lakh in Zone A and Rs 45 lakh in Zone B. All industries qualify, commercial and institutional units included.

A single condition applies to repeat claims. Where subsidy has already been taken on the existing power load, a fresh claim is permitted only on the incremental power load. Where no subsidy has been taken previously, the claim is calculated on the aggregated power load. The timing of a first claim therefore matters: claiming early on a small load lowers the amount available to claim later.

Who can apply

Eligible business forms
Not specified
Udyam registration
Not specified
MSME registration
Not specified
DPIIT startup recognition
Not required
GST registration
Not specified
Where the business may be based
Jammu and Kashmir

- Units in Jammu & Kashmir across all industries, including commercial and institutional units, are eligible. - The DG set must be new and rated between 10KW and 2000KW. - Where subsidy has already been availed against the existing power load, only the incremental power load qualifies. - Where no subsidy has been availed earlier, the claim is made on the aggregated power load. - The ceiling is Rs 40 lakh in Zone A and Rs 45 lakh in Zone B.

How to apply

1. Register the unit on the Single Window portal under the J&K Industrial Policy 2021-30. 2. Verify your zone (A or B) and check whether DG subsidy has already been claimed against your existing power load. 3. Buy and install a new DG set with a capacity between 10KW and 2000KW. 4. File the claim along with the invoice, payment proof, load sanction and installation certificate. 5. The department checks the load basis and then releases the subsidy, subject to the cap for your zone.

Apply on the issuer's site

How applications are assessed

There is no competitive selection stage. Each claim is checked against three things: the DG set rating, the basis of sanctioned power load (whether incremental or aggregated), and the ceiling for the applicable zone.

Frequently asked questions

How much is subsidised?

The subsidy covers the entire cost of the new DG set, up to the ceiling fixed for the zone.

What are the caps?

Zone A businesses can access up to Rs 40 lakh, while those in Zone B can access up to Rs 45 lakh.

What DG set sizes qualify?

New diesel generator sets are available in capacities from 10KW to 2000KW.

I already claimed this once. Can I claim again?

Yes, but only for the additional power load, as subsidy has already been claimed on the existing load.

What if I never claimed it?

The claim is calculated based on the total aggregated power load.

Who is eligible?

The scheme covers all industries in Jammu & Kashmir, including commercial and institutional units.

Where do I apply?

Businesses apply through the J&K Single Window portal, which operates under the Industrial Policy 2021-30.

Sectors

  • Jammukashmir
  • Industrialpolicy202130
  • Subsidy
  • Manufacturing
  • Dgset
  • Power

Details last verified on 18 October 2026. Source: the issuer's published information.