MySubsidy

Maharashtra Solar Project Subsidy (Higher Rate)

Directorate of Industries, Government of Maharashtra · Central government

Maharashtra's Integrated & Sustainable Textile Policy 2023 funds solar projects with a 50% subsidy, capped at ₹5 crore, for implementing units.

Open, rolling. Applications are accepted continuously — there is no deadline.

Key facts

Subsidy amount
Up to ₹5,00,00,000
Instrument
Subsidy
Deadline
Rolling
Disbursement
Reimbursed after spend

About this scheme

Maharashtra provides a 50% subsidy on the total project cost for units implementing solar projects, capped at ₹5 crore. This support is extended by the Government of Maharashtra through its Integrated & Sustainable Textile Policy 2023.

Solar panels and related infrastructure are eligible to be covered under the subsidy.

Who can apply

Eligible business forms
Private limited company, Limited liability partnership, One person company, Partnership firm, Sole proprietorship
Udyam registration
Not specified
MSME registration
Not specified
DPIIT startup recognition
Not specified
GST registration
Not specified
Where the business may be based
Maharashtra

- Available to units implementing solar projects in Maharashtra

How to apply

Applications for the Solar Project Subsidy are handled within the wider framework of the Maharashtra Integrated & Sustainable Textile Policy 2023. Units that qualify are normally required to file a detailed project proposal setting out the planned solar installation, the projected costs and the expected energy savings. The process generally consists of the following steps:

1. Online submission through the designated state portal. 2. Review of documents, including incorporation certificates, project reports, financial statements and the technical specifications of the solar project. 3. Registration of the unit with the relevant state industrial authority, where this has not already been done. 4. Detailed assessment to verify eligibility and project viability. 5. Final disbursement, which is usually linked to the successful completion and operationalisation of the solar project and often involves a verification visit or the submission of completion certificates and expenditure proofs.

Apply on the issuer's site

How applications are assessed

Applications first go through screening by the Maharashtra Industries Department or a designated nodal agency, which checks that basic eligibility criteria are met and that all documents have been submitted in full. A technical and financial assessment of the proposed solar project then follows, carried out by experts who weigh its feasibility, environmental impact and alignment with policy objectives, along with its cost-effectiveness and potential for energy savings. Shortlisted projects may be subject to site visits or additional verification. The subsidy is finally approved on the recommendation of a selection committee, so that support goes to the projects that are both compliant and most impactful.

Frequently asked questions

What is the primary objective of the Solar Project Subsidy (Higher Rate)?

Maharashtra's incentive is intended to get industrial units in the state to take up solar energy, lowering their running costs and supporting more sustainable, environmentally friendly industrial operations.

What is the maximum subsidy amount available under this program?

The programme provides a 50% subsidy on project cost, capped at ₹5 crore in financial assistance for eligible solar projects.

Which types of entities are eligible to claim this subsidy?

Maharashtra's solar project subsidy is open to registered businesses and industrial enterprises, with textile manufacturing units as a key target under the Textile Policy; other industrial units may also qualify if they fall within the broader scope of that policy.

Is there a specific deadline to apply for this subsidy?

The Maharashtra Integrated & Sustainable Textile Policy 2023 sets no fixed deadline for this incentive, and applications are generally accepted on an ongoing basis until the policy is revised or discontinued. Applicants should check the official Maharashtra Industries Department website for the current application window status.

Does the unit need to contribute any of its own funds?

Yes. Because the subsidy covers 50% of the project cost, the implementing unit must meet the remaining 50% from its own resources or through other financing mechanisms.

What documents are typically required for application?

A solar project proposal with cost estimates, unit incorporation documents, financial statements, technical specifications of the solar system, and proof of ownership or lease of land or facility are typically required. The Maharashtra Industries Department's official application guidelines set out the specific requirements.

Sectors

  • Industrial Goods
  • Textiles Leather
  • Solar Projects
  • Renewable Energy
  • Sustainability
  • Textile Industry
  • Industrial Subsidy
  • Energy Efficiency

Details last verified on 12 November 2026. Source: the issuer's published information.