Nagaland Power Line Drawal Subsidy

Department of Industries & Commerce, Government of Nagaland · Central government

Nagaland reimburses up to Rs 10 lakh, once per unit, for drawing a 33/11KV power line to an industrial unit.

Open, rolling. Applications are accepted continuously — there is no deadline.

Key facts

Subsidy amount
Up to ₹10,00,000
Instrument
Subsidy
Deadline
Rolling
Disbursement
Reimbursed after spend

About this scheme

Under NTIIP 2025, Clause 6.7 covers a cost that genuinely affects factories sited away from developed industrial areas: bringing grid power to the gate. Where an eligible industrial unit draws a 33/11KV line, the State reimburses that cost, capped at Rs 10.00 lakh. To qualify, the unit has to be situated outside the notified developed infrastructure, and the Government must approve its location. The subsidy is one-time, available to a given unit only once; claiming it against the full line-drawal cost rather than in parts is therefore advisable.

Who can apply

Eligible business forms
Not specified
Udyam registration
Not specified
MSME registration
Not specified
DPIIT startup recognition
Not required
GST registration
Not specified
Where the business may be based
Nagaland

- Industrial units in Nagaland are eligible. - The unit must be sited outside the notified developed infrastructure. - The Government must approve the location. - The benefit is available only once per unit.

How to apply

- Secure government approval for the unit's location, either before line-drawal work begins or in parallel with it - Have the 33/11KV line drawn and settle the cost with the power department or the contractor - File an application with the Nagaland Department of Industries and Commerce under clause 6.7 of the NTIIP - Provide the line-drawal cost estimate, the paid bills and the completion certificate issued by the electricity department

Apply on the issuer's site

How applications are assessed

Before any reimbursement is released, the Department checks that the unit is located outside the notified developed infrastructure, that the site was approved by the Government, and that the line-drawal cost is properly documented.

Only once these three conditions are confirmed does the Department proceed to release the reimbursement.

Frequently asked questions

What does the subsidy cover?

The eligible industrial unit bears the cost of drawing a 33/11KV power line.

What is the ceiling?

Rs 10.00 lakh.

Can I claim it more than once?

No. An eligible unit can receive the subsidy only once.

Does my unit's location matter?

Yes. The unit has to be situated outside the notified developed infrastructure, and the Government must approve its location.

Sectors

  • Nagaland
  • Power Infrastructure
  • Reimbursement
  • Industrial Unit
  • Ntiip 2025