Punjab Electricity Duty Waiver: Anchor Units
Department of Industries & Commerce, Government of Punjab · Central government
Punjab offers new anchor units a 15-year electricity duty exemption, capped at 100% of fixed capital investment or their approved DPR load.
Open, rolling. Applications are accepted continuously — there is no deadline.
Key facts
- Subsidy amount
- Not specified
- Instrument
- Subsidy
- Deadline
- Rolling
- Disbursement
- Reimbursed after spend
About this scheme
Under Clause 12.9 of the Punjab Industrial and Business Development Policy 2022, Anchor Units receive a fifteen-year electricity duty exemption, which is five years more than the general large-unit track allows. The exemption is 100% for 15 years, capped at whichever is lower: 100% of Fixed Capital Investment, or a 100% exemption on the power consumption corresponding to the electric load in KW required for the installed capacity recorded in the approved DPR. For new units, the period runs from the date the power connection is released; for expansion cases, it runs from the date of commercial production after expansion.
Energy-intensive plants, which are the ones that typically secure anchor status, carry duty on the monthly power bill as a real operating cost, so fifteen years of exemption amounts to a substantial cumulative saving.
Who can apply
- Eligible business forms
- Not specified
- Udyam registration
- Not specified
- MSME registration
- Not specified
- DPIIT startup recognition
- Not specified
- GST registration
- Not specified
- Where the business may be based
- Punjab
- All eligible Anchor Units in Punjab, covering both new units and expansion cases - The load must match the installed capacity recorded in the approved DPR - The period is counted from the release of the power connection for new units, or from commercial production after expansion - Claims are made under the Industrial and Business Development Policy 2022
How to apply
1. Obtain Anchor Unit status for the project; the DPR must record the installed capacity and electric load. 2. Submit the power connection application and note the release date (or the date commercial production begins after expansion). 3. Submit the electricity duty exemption application through the Invest Punjab Business First portal. 4. Attach the approved DPR, particulars of fixed capital investment and the PSPCL connection documents. 5. Once sanctioned, PSPCL raises bills on the unit without electricity duty for the exemption period.
How applications are assessed
Anchor Unit status is conferred by the State when a project is approved. The exemption is administrative in nature: the department verifies the DPR load and the fixed capital investment that set its limits, then issues the exemption certificate to the power utility.
Frequently asked questions
How much duty is waived?
100% of electricity duty, for 15 years.
What limits the exemption?
The subsidy is capped at whichever is lower: 100% of the Fixed Capital Investment, or the power consumption matching the electric load recorded in the approved DPR.
When does the period start?
The subsidy period begins on the date the power connection is released for new units, or on the date commercial production starts after expansion for expansion cases.
How does it compare with the large-unit exemption?
Large units receive the same 100% exemption, though for 10 years, while anchor units receive it for 15 years.