Rajasthan 75% Transmission Charge Exemption for RE Storage (5%)
Department of Industries and Commerce, Government of Rajasthan · Central government
Renewable energy projects with storage equal to 5% of RE capacity receive a 75% reduction in transmission and wheeling charges for seven years.
Open, rolling. Applications are accepted continuously — there is no deadline.
Key facts
- Subsidy amount
- Not specified
- Instrument
- Subsidy
- Deadline
- Rolling
- Disbursement
- Reimbursed after spend
About this scheme
Under the Rajasthan Investment Promotion Scheme 2024, the Government of Rajasthan provides an incentive for renewable energy (RE) projects that pair generation with storage. To qualify, an RE integrated Storage project must have storage capacity of no less than 5% of its total RE capacity.
Qualifying projects receive a substantial exemption on transmission and wheeling charges. This lowers operating costs for developers and is intended to speed up the rollout of Battery Energy Storage Systems (BESS) in the state.
Storage is central to the scheme's purpose: it helps stabilise the grid, manage peak demand and keep power supply continuous through non-solar hours, supporting a more sustainable green energy ecosystem in Rajasthan. The exemption is also meant to draw investment and innovation into advanced energy storage technologies, in line with the state's energy security and environmental objectives, and to support businesses working towards cleaner, more reliable energy.
Who can apply
- Eligible business forms
- Private limited company, Limited liability partnership, One person company, Partnership firm, Sole proprietorship
- Udyam registration
- Not specified
- MSME registration
- Not specified
- DPIIT startup recognition
- Not specified
- GST registration
- Not specified
- Where the business may be based
- Rajasthan
- The project must qualify as a Renewable Energy (RE) integrated Storage project. - The storage component must be sized at 5% of the total Renewable Energy (RE) capacity. - The project must be designed to supply power from its Battery Energy Storage System (BESS) during peak demand hours or non-solar hours. - Applicants must meet the wider eligibility criteria and follow the application procedures set out in the Rajasthan Investment Promotion Scheme 2024.
How to apply
- Applicants should consult the detailed application guidelines contained in the Rajasthan Investment Promotion Scheme 2024. - A complete application form, usually obtainable via the designated government portal, must be submitted together with all technical and financial documentation required for the RE integrated Storage project. - Evidence of the project design, RE capacity and the integrated storage capacity (5% of RE capacity) as stipulated by the scheme must be furnished. - All incorporation and registration documents of the project entity must be current and must accompany the application. - The relevant state authority will verify the application to confirm compliance with all eligibility criteria.
Frequently asked questions
What type of projects are eligible for this exemption?
The exemption applies only to RE-integrated storage projects in which storage capacity equals at least 5% of total renewable energy capacity.
What does the exemption cover?
The scheme covers 75% of the transmission and wheeling charges for a renewable energy project integrated with storage that meets the eligibility criteria.
For how long is this exemption valid?
The exemption runs for 7 years without a break, counted from the date the project is commissioned, or for the period stated in the approval letter.
What is the primary objective of this scheme?
The scheme aims to integrate energy storage with renewable energy projects in Rajasthan, improve grid stability and support the state's green energy initiatives by lowering developers' operational costs.
Is there a specific application deadline for this incentive?
Under the Rajasthan Investment Promotion Scheme 2024, applications are generally accepted on a rolling basis; check the official scheme document or portal for any specific application windows or updates.
Does the project need to be located in Rajasthan?
Yes. Being a state-specific incentive under the Rajasthan Investment Promotion Scheme, the RE integrated Storage project has to be set up and made operational within Rajasthan.
Sectors
- Energy Climate
- Mobility Transport
- Renewable Energy
- Energy Storage
- Rajasthan
- Subsidies
Details last verified on 11 November 2026. Source: the issuer's published information.