MySubsidy

Rajasthan 75% Transmission Charge Exemption for RE Storage (5%)

Department of Industries and Commerce, Government of Rajasthan · Central government

Renewable energy projects with storage equal to 5% of RE capacity receive a 75% waiver on transmission and wheeling charges for 7 years.

Open, rolling. Applications are accepted continuously — there is no deadline.

Key facts

Subsidy amount
Not specified
Instrument
Subsidy
Deadline
Rolling
Disbursement
Reimbursed after spend

About this scheme

Rajasthan Investment Promotion Scheme 2024, introduced by the Government of Rajasthan, provides an incentive for combining renewable energy with storage. Projects that qualify are those where storage capacity equals no less than 5% of the total RE capacity.

Under this scheme, qualifying RE integrated Storage projects receive an exemption on transmission and wheeling charges. The purpose is to bring down operating expenses for developers and to speed up the installation of Battery Energy Storage Systems (BESS) across Rajasthan.

Such storage capacity helps keep the grid stable, meet peak demand, and maintain power supply through non-solar hours. The exemption is also intended to draw investment into advanced energy storage technologies, in line with the state's objectives on energy security and environmental responsibility.

Who can apply

Eligible business forms
Private limited company, Limited liability partnership, One person company, Partnership firm, Sole proprietorship
Udyam registration
Not specified
MSME registration
Not specified
DPIIT startup recognition
Not specified
GST registration
Not specified
Where the business may be based
Rajasthan

- The project must qualify as a Renewable Energy (RE) integrated Storage project. - The storage component must be sized at 5% of the total Renewable Energy (RE) capacity. - The project must be configured to feed power from its Battery Energy Storage System (BESS) during peak demand hours or non-solar hours. - Applicants must comply with the wider eligibility conditions and application process laid down under the Rajasthan Investment Promotion Scheme 2024.

How to apply

1. Read the detailed application guidelines issued under the Rajasthan Investment Promotion Scheme 2024 before applying. 2. File a complete application form — usually obtainable on the designated government portal — together with every technical and financial document the RE integrated Storage project requires. 3. Attach evidence of the project design, the RE capacity, and the integrated storage capacity, which the scheme fixes at 5% of RE capacity. 4. Make sure the project entity's incorporation and registration papers are valid as on date and enclosed with the application. 5. The concerned state authority will verify the application against all eligibility criteria.

Apply on the issuer's site

Frequently asked questions

What type of projects are eligible for this exemption?

RE-integrated storage projects qualify for this exemption only when the storage capacity equals or exceeds 5% of the total renewable energy capacity.

What does the exemption cover?

The scheme bears 75% of the transmission and wheeling charges for a renewable energy project that includes storage and meets the eligibility conditions.

For how long is this exemption valid?

The exemption runs for 7 years without a break, counted from the date the project is commissioned, or for the duration stated in the approval letter.

What is the primary objective of this scheme?

Rajasthan's scheme aims to combine energy storage with renewable energy projects, improve grid stability, and advance the state's green energy initiatives while lowering developers' operational costs.

Is there a specific application deadline for this incentive?

Under the Rajasthan Investment Promotion Scheme 2024, applications are generally accepted on a rolling basis, though the official scheme document or portal should be checked for specific application windows or updates.

Does the project need to be located in Rajasthan?

Yes. Being a state-specific incentive under the Rajasthan Investment Promotion Scheme, the RE integrated Storage project has to be set up and made operational within Rajasthan.

Sectors

  • Climate Energy Ev
  • Renewable Energy
  • Energy Storage
  • Rajasthan
  • Subsidies

Details last verified on 18 September 2026. Source: the issuer's published information.