Rajasthan 100% Transmission Charge Exemption for RE Storage (30%+)
Department of Industries and Commerce, Government of Rajasthan · Central government
Battery storage above 30% of renewable capacity earns 100% waiver of transmission and wheeling charges for such projects.
Open, rolling. Applications are accepted continuously — there is no deadline.
Key facts
- Subsidy amount
- Not specified
- Instrument
- Subsidy
- Deadline
- Rolling
About this scheme
Under the Rajasthan Investment Promotion Scheme 2024, the state government is promoting investment and development in renewable energy. Incentive 89 in the policy document applies to Renewable Energy (RE) integrated Storage projects. Where Battery Energy Storage System (BESS) capacity is more than 30% of overall RE capacity, the scheme gives a 100% exemption from Transmission & Wheeling charges, which lowers operating costs for developers.
The measure is intended to improve the economic viability of energy storage, support the integration of intermittent renewable sources into the grid, and speed up Rajasthan's move to a sustainable energy future. It also backs projects that contribute to grid stability and efficiency, and is expected to make the state more attractive for green investment.
Who can apply
- Eligible business forms
- Private limited company, Limited liability partnership, One person company, Partnership firm, Sole proprietorship
- Udyam registration
- Not specified
- MSME registration
- Not specified
- DPIIT startup recognition
- Not specified
- GST registration
- Not specified
- Where the business may be based
- Rajasthan
- Renewable Energy (RE) integrated Storage projects are eligible. - The Battery Energy Storage System (BESS) capacity must exceed 30% of the project's total RE capacity.
How to apply
To claim this exemption, applicants generally go through the standard application procedure set out under the Rajasthan Investment Promotion Scheme 2024. That procedure typically comprises:
- Filing a detailed project proposal with the designated state authority that administers RIPS 2024, which is usually a department under the Government of Rajasthan. - Furnishing documentation showing that the project meets every eligibility criterion, including the ratio of Battery Energy Storage System (BESS) capacity to Renewable Energy (RE) capacity. - Complying with the formats or forms prescribed for incentive claims under the policy. - Waiting for the scheme's administering body to review and approve the claim; that body verifies eligibility and then grants the exemption.
Frequently asked questions
What specific charges are covered by this exemption?
Eligible projects receive a full exemption from Transmission and Wheeling charges, which are the fees normally levied for moving electricity across the grid.
Which types of projects are eligible for this exemption?
The exemption applies to Renewable Energy (RE) integrated Storage projects, and one eligibility condition is that the Battery Energy Storage System (BESS) capacity must exceed 30% of the project's total Renewable Energy capacity.
Is this a grant or a loan?
It is an exemption from charges rather than a grant or a repayable loan, so it lowers the running costs of eligible projects instead of supplying upfront capital.
How does a company apply for this exemption?
The application is made through the Rajasthan Investment Promotion Scheme 2024 process, which generally requires submitting an application to the relevant state department or authority and showing that the eligibility criteria in the policy document are met.
Is there a deadline to apply for this incentive?
No application deadline is specified, as the exemption operates under an active scheme and is available on a rolling basis. Projects are assessed against the specified criteria at the time of application.
What is the primary objective of this exemption?
The scheme's main aim is to make Renewable Energy (RE) integrated Storage projects in Rajasthan more economically viable by substantially lowering their operational costs for power transmission and wheeling. It also seeks to draw investment into green energy infrastructure and support grid stability.
Sectors
- Energy Climate
- Mobility Transport
- Renewable Energy
- Energy Storage
- Battery Energy Storage
- Transmission Charges
- Wheeling Charges
- Policy Incentive
- Rajasthan
Details last verified on 11 November 2026. Source: the issuer's published information.