MySubsidy

Rajasthan 100% Transmission Charge Exemption for RE Storage (30%+)

Department of Industries and Commerce, Government of Rajasthan · Central government

Battery storage exceeding 30% of renewable capacity earns RE projects full waiver of transmission and wheeling charges.

Open, rolling. Applications are accepted continuously — there is no deadline.

Key facts

Subsidy amount
Not specified
Instrument
Subsidy
Deadline
Rolling

About this scheme

Rajasthan Investment Promotion Scheme 2024, introduced by the Government of Rajasthan, extends an incentive to the renewable energy sector. Listed as incentive 89 in the policy document, this provision applies to Renewable Energy (RE) integrated Storage projects.

Under this incentive, projects in which Battery Energy Storage System (BESS) capacity is more than 30% of total RE capacity receive a full exemption from Transmission & Wheeling charges. The purpose is to bring down operating expenses for developers.

Such support improves the financial feasibility of energy storage, helps bring variable renewable generation onto the grid, and speeds up Rajasthan's shift towards sustainable energy. The exemption backs projects that add to grid stability and efficiency, strengthening the state's appeal as a destination for green investment.

Who can apply

Eligible business forms
Private limited company, Limited liability partnership, One person company, Partnership firm, Sole proprietorship
Udyam registration
Not specified
MSME registration
Not specified
DPIIT startup recognition
Not specified
GST registration
Not specified
Where the business may be based
Rajasthan

- Renewable Energy (RE) integrated Storage projects are eligible. - The Battery Energy Storage System (BESS) capacity of the project must exceed 30% of its total RE capacity.

How to apply

To claim this exemption, applicants generally complete the standard application procedure set out under the Rajasthan Investment Promotion Scheme 2024. That procedure typically consists of:

- Filing a comprehensive project proposal with the nominated state authority tasked with administering RIPS 2024, which is usually a department under the Government of Rajasthan. - Furnishing documents that establish the project meets every eligibility condition, among them the ratio of Battery Energy Storage System (BESS) capacity to Renewable Energy (RE) capacity. - Following whatever formats or forms are stipulated for incentive claims under the policy. - Waiting for the scheme's administering body to review the submission, confirm eligibility and sanction the exemption.

Apply on the issuer's site

Frequently asked questions

What specific charges are covered by this exemption?

Eligible projects receive a full exemption from both Transmission and Wheeling charges — the fees normally payable for moving electricity across the grid.

Which types of projects are eligible for this exemption?

This exemption applies only to Renewable Energy (RE) integrated Storage projects, and eligibility requires that the Battery Energy Storage System (BESS) capacity exceed 30% of the project's total Renewable Energy capacity.

Is this a grant or a loan?

It is neither a grant nor a repayable loan, but an exemption from charges that lowers the running costs of eligible projects instead of supplying upfront capital.

How does a company apply for this exemption?

The application is filed under the wider Rajasthan Investment Promotion Scheme 2024 process, though the steps specific to this incentive are not set out. In practice this means applying to the concerned state department or authority and showing that the eligibility conditions in the policy document are met.

Is there a deadline to apply for this incentive?

Since this exemption operates as a policy incentive under a running scheme, applications are accepted on a rolling basis and no fixed deadline is specified. Projects are assessed against the stated criteria as they stand when the application is submitted.

What is the primary objective of this exemption?

The scheme's main aim is to make Renewable Energy (RE) integrated Storage projects in Rajasthan more economically viable by substantially lowering their power transmission and wheeling costs, which in turn draws investment into green energy infrastructure and aids grid stability.

Sectors

  • Climate Energy Ev
  • Renewable Energy
  • Energy Storage
  • Battery Energy Storage
  • Transmission Charges
  • Wheeling Charges
  • Policy Incentive
  • Rajasthan

Details last verified on 18 September 2026. Source: the issuer's published information.