Rajasthan's scheme fully waives or reimburses banking, wheeling and transmission charges for captive power plants in notified Sunrise sectors.

Open, rolling. Applications are accepted continuously — there is no deadline.

Key facts

Subsidy amount
Not specified
Instrument
Subsidy
Deadline
Rolling
Disbursement
Reimbursed after spend

About this scheme

The Banking, Wheeling and Transmission Charges Waiver/Reimbursement (Sunrise) scheme operates as an incentive under the Rajasthan Investment Promotion Scheme 2024. It is intended to spur industrial growth and investment in Rajasthan by lowering the operational costs that 'Sunrise Enterprises' incur when establishing and operating captive power plants.

Through waiving or reimbursing specified electricity charges, the government seeks to make power generation more affordable for these sectors, encourage self-sufficiency in electricity, and support sustainable industrial development throughout the state.

The incentive is directed at enterprises that advance the state's economic priorities and those whose operations demand substantial power infrastructure. It forms part of Rajasthan's efforts to back new age industries and strengthen its standing as an investment destination.

Who can apply

Eligible business forms
Private limited company, Limited liability partnership, One person company, Partnership firm, Sole proprietorship
Udyam registration
Not specified
MSME registration
Not specified
DPIIT startup recognition
Not specified
GST registration
Not specified
Where the business may be based
Rajasthan

- Available to 'Sunrise Enterprises' as defined under Section 3.3.1.1 of the RIPS 2024, except in the case of Green Hydrogen, which is excluded from certain benefits. - Open to enterprises that establish captive power plants in Rajasthan. - The power produced must be consumed entirely for captive purposes; sale to third parties is not permitted. - Each eligible enterprise may claim benefits for a maximum of its first 3 units. - The captive power plant size is capped at 200% (250% in the case of Green Hydrogen projects).

How to apply

- **Submit Application**: Enterprises seeking this benefit need to apply via the portal or department designated under the Rajasthan Investment Promotion Scheme 2024, which is generally the Industries Department. - **Required Documentation**: Assemble and file the documents that are needed, which ordinarily comprise proof of enterprise registration, detailed project reports for the captive power plant, confirmation of 'Sunrise Enterprise' status, and a declaration of captive consumption only. - **Verification**: The application and documents filed will be examined through a verification process carried out by the relevant government authorities, to confirm that all eligibility criteria are met. - **Approval and Disbursement**: Once verification and approval are completed successfully, the enterprise receives the benefit either as waivers on charges due in future or as reimbursement for charges already paid, in line with the policy guidelines and corresponding to the Asset Creation Incentive period.

Apply on the issuer's site

How applications are assessed

For this incentive, selection is essentially an administrative exercise. A committee or designated authority within the Government of Rajasthan examines each application to confirm that the eligibility conditions are satisfied — the enterprise's status as a 'Sunrise Enterprise', the type of captive power plant, its use for captive consumption, and adherence to the prescribed size ceilings. Applicants are not required to make a competitive pitch, nor does a jury assess them; the exercise amounts to verifying claims against the parameters laid down in policy, so that the benefits reach the claimants who are entitled to them.

Frequently asked questions

What charges are covered under this scheme?

For eligible captive power plants that Sunrise Enterprises establishes in Rajasthan, the scheme bears 100% of banking, wheeling and transmission charges, either by waiving them or by reimbursing them.

Which enterprises are eligible for this incentive?

Under the Rajasthan Investment Promotion Scheme 2024, the incentive applies to 'Sunrise Enterprises' as defined in Section 3.3.1.1 — specifically those establishing captive power plants, provided the power generated is used solely for captive consumption with no third-party sales. Green Hydrogen projects fall within the Sunrise sector as well, though their ceiling differs slightly.

Is there a limit to how many units can claim this benefit?

Yes — the benefit applies to the first three units set up by each eligible enterprise in the Sunrise sectors, except for Green Hydrogen, which is a Sunrise sector governed by its own terms and is excluded from this first-three-units provision.

What are the restrictions on the captive power plant?

The scheme requires that the energy generated be consumed entirely by the enterprise itself, with third-party sales not permitted. It also caps the captive power plant at 200% of the enterprise's connected load or consumption, or 250% for Green Hydrogen projects.

How long does the waiver/reimbursement period last?

The waiver or reimbursement of Banking, Wheeling and Transmission charges applies for the same period over which the Asset Creation Incentive chosen by the enterprise is disbursed under the Rajasthan Investment Promotion Scheme 2024. The exact duration therefore depends on the terms of that incentive.

How do I apply for this waiver/reimbursement?

Under the Rajasthan Investment Promotion Scheme 2024, applications are filed with the designated department, most likely the State Industries Department or a single-window clearance portal. An enterprise must submit a formal application with documents establishing its Sunrise Enterprise status, the captive power plant details, and its consumption records.

Sectors

  • Renewable Energy
  • Captive Power
  • Manufacturing
  • Rajasthan
  • Energy Efficiency
  • Industrial Development

Details last verified on 16 September 2026. Source: the issuer's published information.