Rajasthan Sunrise Captive Power Waiver Scheme
Department of Industries and Commerce, Government of Rajasthan · Central government
Rajasthan's scheme fully waives or reimburses banking, wheeling and transmission charges for captive power plants in identified Sunrise sectors.
Open, rolling. Applications are accepted continuously — there is no deadline.
Key facts
- Subsidy amount
- Not specified
- Instrument
- Subsidy
- Deadline
- Rolling
- Disbursement
- Reimbursed after spend
About this scheme
The Banking, Wheeling and Transmission Charges Waiver/Reimbursement (Sunrise) scheme is an incentive under the Rajasthan Investment Promotion Scheme 2024. It seeks to promote industrial growth and investment in Rajasthan by lowering the operational costs that 'Sunrise Enterprises' incur in setting up and running captive power plants. Through waiving or reimbursing these electricity charges, the government intends to make power generation more economical for these sectors, encourage self-sufficiency in power and support sustainable industrial development across the state.
The incentive is directed at enterprises that contribute to the state's economic priorities and at those needing substantial power infrastructure to operate efficiently. It reflects Rajasthan's commitment to supporting new age industries and strengthening its competitive advantage as an investment destination.
Who can apply
- Eligible business forms
- Private limited company, Limited liability partnership, One person company, Partnership firm, Sole proprietorship
- Udyam registration
- Not specified
- MSME registration
- Not specified
- DPIIT startup recognition
- Not specified
- GST registration
- Not specified
- Where the business may be based
- Rajasthan
- Available to 'Sunrise Enterprises' as defined under Section 3.3.1.1 of the RIPS 2024; Green Hydrogen is excluded from certain specified benefits. - Open to enterprises that set up captive power plants within Rajasthan. - The power generated must be consumed entirely for captive use; sale to third parties is not permitted. - Benefits apply only to the first 3 units set up by each eligible enterprise. - The captive power plant's size is capped at 200% (250% in the case of Green Hydrogen projects).
How to apply
- **Submit application**: Enterprises seeking this benefit must apply through the portal or department designated under the Rajasthan Investment Promotion Scheme 2024, which is usually the Industries Department. - **Documentation required**: Assemble and submit the documents called for, which generally comprise proof of enterprise registration, detailed project reports for the captive power plant, confirmation of 'Sunrise Enterprise' status, and a declaration that captive consumption alone applies. - **Verification**: The application and accompanying documents are examined by the relevant government authorities to confirm that every eligibility criterion is met. - **Approval and disbursement**: Once verification and approval are complete, the benefit is extended to the enterprise either as waivers on future charges or as reimbursement of charges already paid, in line with the policy guidelines and corresponding to the Asset Creation Incentive period.
How applications are assessed
The incentive is awarded through an administrative process rather than a competitive one. An application is examined by a committee or designated authority within the Government of Rajasthan, which verifies that the enterprise qualifies as a 'Sunrise Enterprise', that the captive power plant is of the required nature and used for captive consumption, and that the applicable size ceilings are respected. No pitch or jury assessment is involved; selection rests on checking each claim against the defined policy parameters so that the stated benefits reach the enterprises entitled to them.
Frequently asked questions
What charges are covered under this scheme?
The scheme waives or reimburses 100% of banking, wheeling and transmission charges for eligible captive power plants that Sunrise Enterprises sets up in Rajasthan.
Which enterprises are eligible for this incentive?
Under the Rajasthan Investment Promotion Scheme 2024, the incentive applies to 'Sunrise Enterprises' as defined in Section 3.3.1.1 — specifically those setting up captive power plants, provided the energy generated is used exclusively for captive consumption with no third-party sales; Green Hydrogen projects fall within the Sunrise sector but have a slightly different ceiling.
Is there a limit to how many units can claim this benefit?
Yes — the benefit applies to the first 3 units set up by each eligible enterprise in the Sunrise sectors, except Green Hydrogen, which is excluded from this 'first 3 units' clause and is covered under its own terms as a Sunrise sector.
What are the restrictions on the captive power plant?
The scheme requires that the energy generated be used only for the enterprise's own consumption, and third-party sales are not permitted. The captive power plant's size is capped at 200% of the enterprise's connected load or consumption, or 250% for Green Hydrogen projects.
How long does the waiver/reimbursement period last?
The waiver or reimbursement of Banking, Wheeling and Transmission charges applies for the same period as the disbursal of the Asset Creation Incentive the enterprise selects under the Rajasthan Investment Promotion Scheme 2024. The exact duration therefore depends on the terms of that incentive.
How do I apply for this waiver/reimbursement?
Under the Rajasthan Investment Promotion Scheme 2024, applications are generally handled by the designated department, likely the State Industries Department or a single-window clearance portal. Enterprises submit a formal application with documentation of Sunrise Enterprise status, captive power plant details and consumption records.
Sectors
- Renewable Energy
- Captive Power
- Manufacturing
- Rajasthan
- Energy Efficiency
- Industrial Development
Details last verified on 11 November 2026. Source: the issuer's published information.