MySubsidy

Tripura Power Charges Reimbursement

Department of Industries and Commerce, Government of Tripura · Central government

Tripura reimburses industrial power at Rs.5.00 per unit for units above 20 HP, or 25% up to Rs.15/Rs.25 lakh yearly for those up to 20 HP.

Open, rolling. Applications are accepted continuously — there is no deadline.

Key facts

Subsidy amount
Not specified
Instrument
Subsidy
Deadline
Rolling
Disbursement
Reimbursed after spend

About this scheme

Under the Tripura Industrial Investment Promotion Incentives Scheme, 2022, industrial units in Tripura may claim support towards power charges. This record covers that power-charges incentive (section 4). The applicable rate turns on connected load — above 20 HP as against up to 20 HP — and, within the smaller-load band, on whether the enterprise falls in the Non-Thrust or Thrust Sector.

Where an industrial unit's connected load exceeds 20 HP, power charges are provided at Rs.5.00 per unit, with no upper ceiling. That Rs.5.00 per unit is a rate per unit of electricity; it is not a lump-sum award, nor is it treated here as a total rupee grant. No rupee cap is stated for this above-20 HP band.

Where an industrial unit's connected load is up to 20 HP, the State reimburses 25% of the power charges actually paid, subject to an upper ceiling of Rs.15 lakhs per annum for a Non-Thrust Sector enterprise and Rs.25 lakhs per annum for a Thrust Sector enterprise. In this band, the bill is paid first and a quarter of it claimed back, cut off at those yearly ceilings.

The claimant is the industrial unit in Tripura — not a housing colony or a commercial shop that happens to share a feeder. Keep connected-load documents from the licensee, monthly electricity bills, and payment proof. Thrust versus Non-Thrust changes only the Rs.15 lakhs / Rs.25 lakhs ceiling in the up-to-20 HP band; the above-20 HP band is Rs.5.00 per unit with no upper ceiling in the clause.

Apply through SWAAGAT and the District Industries Centre. TIIPIS 2022 is rolling; this clause carries no deadline. The Department of Industries and Commerce, Government of Tripura verifies load, bills, and sector band before release. This is a subsidy — not equity and not a loan. Because the headline rate is per unit, this record sets no total award floor or ceiling in rupees.

Who can apply

Eligible business forms
Private limited company, Limited liability partnership, One person company, Partnership firm, Sole proprietorship
Udyam registration
Not specified
MSME registration
Not required
DPIIT startup recognition
Not required
GST registration
Not specified
Where the business may be based
Tripura

- Industrial units must be located in Tripura. - For units with a connected load exceeding 20 HP, support is Rs.5.00 per unit; the clause specifies no upper ceiling. - For units with a connected load of up to 20 HP, support is 25% of power charges actually paid. - For up to 20 HP Non-Thrust units, the ceiling is Rs.15 lakhs per enterprise per annum. - For up to 20 HP Thrust units, the ceiling is Rs.25 lakhs per enterprise per annum. - Claims are made against bills actually paid or recorded consumption; this is not a cash prize.

How to apply

- Verify that the unit qualifies as an industrial unit in Tripura, and record the sanctioned or connected load in HP. The 20 HP threshold determines whether the Rs.5.00-per-unit route or the 25% route applies. - Gather the licensee's proof of connected load, monthly power bills and payment receipts. - Where the load does not exceed 20 HP, also note whether the enterprise falls under Non-Thrust or Thrust category (Rs.15 lakhs against Rs.25 lakhs per year). - Submit the TIIPIS 2022 power-charges claim on SWAAGAT (https://swaagat.tripura.gov.in/) and at the District Industries Centre. - Enclose unit identity documents, proof of location in Tripura, load documents and bills. - Once the Department has verified the load and the charges, support is disbursed as the clause provides — Rs.5.00 per unit with no ceiling above 20 HP, or 25% of charges paid, subject to the yearly ceiling, up to 20 HP.

Apply on the issuer's site

How applications are assessed

The District Industries Centre, working with the Department of Industries and Commerce, verifies that the applicant is an industrial unit in Tripura. This involves checking the connected load against the 20 HP threshold and applying the corresponding formula to the bills submitted.

Where the load exceeds 20 HP, the rate is Rs.5.00 per unit, with no upper ceiling. For loads up to 20 HP, the calculation is 25% of power charges actually paid, subject to a cap of Rs.15 lakhs or Rs.25 lakhs per annum depending on the sector. No pitch round is involved. Claims that lack load proof, or that show unpaid-bill gaps within the 25% band, are queried or refused.

Frequently asked questions

What do units above 20 HP connected load receive?

Power charges are reimbursed at Rs.5.00 per unit, with no upper ceiling on the amount. This is a per-unit rate rather than a fixed annual rupee grant.

What do units up to 20 HP receive?

Power charges actually paid are reimbursed at 25%, capped at Rs.15 lakhs per annum for the Non-Thrust Sector and Rs.25 lakhs per annum for the Thrust Sector.

Is there a total rupee award I can budget as a grant?

No lump-sum amount is specified. Above 20 HP, the rate is Rs.5.00 per unit with no ceiling; up to 20 HP, the annual ceiling is Rs.15 lakhs or Rs.25 lakhs, based on a 25% reimbursement of bills paid.

Who can claim?

Tripura's industrial units are classified according to connected load, whether above or up to 20 HP, and within the lower-load category a further distinction is drawn between Non-Thrust and Thrust Sector units.

Do I need to pay the electricity bill first?

Yes. Units drawing up to 20 HP are reimbursed at 25% of the power charges actually paid, while those above 20 HP are covered at Rs.5.00 per unit; in both cases, retain licensee bills and load papers.

Where do I apply?

Apply through SWAAGAT at https://swaagat.tripura.gov.in/ or via the District Industries Centre under the Department of Industries and Commerce, Government of Tripura. As TIIPIS 2022 is a rolling scheme, this clause carries no deadline.

Is this MSME-only?

The clause refers to industrial units and connected load, and does not limit the benefit to MSMEs alone.

Sectors

  • Tripura
  • Tiipis 2022
  • Power Subsidy
  • Electricity
  • Reimbursement
  • Industrial Unit
  • State Scheme
  • Swaagat

Details last verified on 18 September 2026. Source: the issuer's published information.