Tripura Power Charges Reimbursement
Department of Industries and Commerce, Government of Tripura · Central government
Tripura funds industrial power bills for units above 20 HP at Rs.5.00 per unit with no ceiling, and for units up to 20 HP at 25% reimbursement capped at Rs.15–25 lakh a year.
Open, rolling. Applications are accepted continuously — there is no deadline.
Key facts
- Subsidy amount
- Not specified
- Instrument
- Subsidy
- Deadline
- Rolling
- Disbursement
- Reimbursed after spend
About this scheme
Under the Tripura Industrial Investment Promotion Incentives Scheme, 2022, industrial units in Tripura may claim support towards power charges. This record covers that power-charges incentive (section 4). The applicable rate turns on connected load — above 20 HP as against up to 20 HP — and, within the smaller-load band, on whether the enterprise falls in the Non-Thrust or Thrust Sector.
Industrial units whose connected load exceeds 20 HP receive power charges at Rs.5.00 per unit, with no upper ceiling. The Rs.5.00 per unit figure is a rate applied to each unit of electricity; it is not a lump-sum award and is not treated here as a total rupee grant. No rupee cap is stated for this above-20 HP band.
For industrial units with connected load up to 20 HP, the State reimburses 25% of power charges actually paid, subject to an upper ceiling of Rs.15 lakhs per annum for a Non-Thrust Sector enterprise and Rs.25 lakhs per annum for a Thrust Sector enterprise. In this band the bill is paid first and a quarter of it claimed back, cut off at those yearly ceilings.
The claimant is the industrial unit in Tripura — not a housing colony or a commercial shop that happens to share a feeder. Retain connected-load documents from the licensee, monthly electricity bills and payment proof. Thrust versus Non-Thrust status affects only the Rs.15 lakhs / Rs.25 lakhs ceiling in the up-to-20 HP band; the above-20 HP band remains Rs.5.00 per unit with no upper ceiling in the clause.
Apply through SWAAGAT and the District Industries Centre. TIIPIS 2022 is rolling; this clause carries no deadline. The Department of Industries and Commerce, Government of Tripura verifies load, bills and sector band before release. This is a subsidy — neither equity nor a loan. Because the headline rate is per unit, this record sets no total award floor or ceiling in rupees.
Who can apply
- Eligible business forms
- Private limited company, Limited liability partnership, One person company, Partnership firm, Sole proprietorship
- Udyam registration
- Not specified
- MSME registration
- Not required
- DPIIT startup recognition
- Not required
- GST registration
- Not specified
- Where the business may be based
- Tripura
- Industrial units must be located in Tripura. - Units with connected load above 20 HP: support at Rs.5.00 per unit; the clause sets no upper ceiling. - Units with connected load up to 20 HP: 25% of power charges actually paid. - Up to 20 HP, Non-Thrust: ceiling of Rs.15 lakhs per enterprise per annum. - Up to 20 HP, Thrust: ceiling of Rs.25 lakhs per enterprise per annum. - Claims are made against bills actually paid or recorded consumption; this is not a cash prize.
How to apply
1. Verify that the unit is an industrial unit in Tripura and record the sanctioned or connected load in HP; the 20 HP threshold determines whether the Rs.5.00-per-unit route or the 25% route applies. 2. Gather the licensee's proof of connected load, the monthly power bills and the payment receipts. 3. Where the load is up to 20 HP, also record whether the enterprise is Non-Thrust or Thrust (Rs.15 lakhs versus Rs.25 lakhs a year). 4. Submit the TIIPIS 2022 power-charges claim on SWAAGAT (https://swaagat.tripura.gov.in/) and with the District Industries Centre. 5. Attach the unit's identity documents, proof of location in Tripura, load documents and bills. 6. Once the Department has verified the load and the charges, support is released as the clause provides — Rs.5.00 per unit with no ceiling above 20 HP, or 25% of the charges paid, within the yearly ceiling, up to 20 HP.
How applications are assessed
The District Industries Centre and the Department of Industries and Commerce verify that the applicant is an industrial unit in Tripura, check the connected load against the 20 HP threshold, and match bills to the applicable formula. Where the load exceeds 20 HP, they apply Rs.5.00 per unit with no upper ceiling; where it is up to 20 HP, they apply 25% of power charges actually paid, subject to a cap of Rs.15 lakhs or Rs.25 lakhs per annum depending on the sector. There is no pitch round. Claims lacking load proof, or with unpaid-bill gaps in the 25% band, are queried or refused.
Frequently asked questions
What do units above 20 HP connected load receive?
Power charges are provided at Rs.5.00 per unit, with no upper ceiling. This is a per-unit rate rather than a fixed rupee grant for the year.
What do units up to 20 HP receive?
Power charges actually paid are reimbursed at 25%, capped at Rs.15 lakhs per annum for the Non-Thrust Sector and Rs.25 lakhs per annum for the Thrust Sector.
Is there a total rupee award I can budget as a grant?
No lump-sum amount is specified. Above 20 HP, the rate is Rs.5.00 per unit with no ceiling; up to 20 HP, the annual ceilings are Rs.15 lakhs or Rs.25 lakhs, based on a 25% reimbursement of bills paid.
Who can claim?
For industrial units in Tripura, the applicable category depends on connected load — above or up to 20 HP — and, within the smaller-load band, on whether the unit falls under the Non-Thrust or Thrust Sector.
Do I need to pay the electricity bill first?
Yes — for the up-to-20 HP band, 25% of power charges actually paid is reimbursed, while the above-20 HP band is covered at Rs.5.00 per unit under the clause. In either case, retain licensee bills and load papers.
Where do I apply?
Applications are submitted through SWAAGAT (https://swaagat.tripura.gov.in/) or the District Industries Centre under the Department of Industries and Commerce, Government of Tripura. TIIPIS 2022 operates on a rolling basis, so this clause carries no deadline.
Is this MSME-only?
The clause refers to industrial units and connected load, and it does not limit the benefit to MSMEs alone.
Sectors
- Tripura
- Tiipis 2022
- Power Subsidy
- Electricity
- Reimbursement
- Industrial Unit
- State Scheme
- Swaagat
Details last verified on 12 November 2026. Source: the issuer's published information.