Meghalaya Power Connection Charge Subsidy

Department of Commerce and Industries, Government of Meghalaya · Central government

Meghalaya reimburses 50% of power service connection charges, capped at Rs 2 lakhs, to micro and small units.

Open, rolling. Applications are accepted continuously — there is no deadline.

Key facts

Subsidy amount
Up to ₹2,00,000
Instrument
Subsidy
Deadline
Rolling
Disbursement
Reimbursed after spend

About this scheme

Under Clause 3.4.7.iii.a of the Meghalaya Industrial and Investment Promotion Policy (MIIPP) 2024, Micro and Small Units can claim a subsidy covering 50% of Power Service Connection Charges. Internal wiring is excluded from this benefit, and the amount is capped at Rs 2 lakhs.

This provision sits alongside a separate benefit: units that draw an 11 KV or higher power line to their premises are eligible for 100% reimbursement of that cost.

Who can apply

Eligible business forms
Not specified
MSME categories accepted
Micro, Small
Udyam registration
Not specified
MSME registration
Required
DPIIT startup recognition
Not required
GST registration
Not specified
Maximum age of business
5 years
Where the business may be based
Meghalaya

- The unit is a Micro or Small Unit situated in Meghalaya. - A power service connection has been obtained for the unit. - Internal wiring costs do not form part of the eligible amount.

How to apply

1. Get the power service connection for the unit completed in Meghalaya. 2. Retain the invoices, payment receipts and the utility's commissioning or connection documents. 3. Submit the claim to the Commerce and Industries Department via the Invest Meghalaya single window. 4. The amount is disbursed once the department has verified the eligible cost.

Apply on the issuer's site

How applications are assessed

The Commerce and Industries Department examines each claim under MIIPP 2024, checking it against the eligible cost and the size category of the unit. No competitive selection is involved.

Frequently asked questions

How much is the subsidy?

Power service connection charges are covered at 50%, capped at Rs 2 lakhs.

Is internal wiring covered?

No. Internal wiring is excluded under this clause.

Which units qualify?

Micro and Small Units in Meghalaya.

Can I also claim for drawing the power line?

For drawing an 11 KV or higher line, clause 3.4.7.ii.a provides separate reimbursement of 100% of the cost, subject to a maximum of Rs 10 lakhs.

Sectors

  • Meghalaya
  • Electricity Connection
  • Power Charges
  • Msme
  • Miipp 2024
  • Reimbursement

Details last verified on 1 November 2026. Source: the issuer's published information.