Meghalaya Power Connection Charge Subsidy
Department of Commerce and Industries, Government of Meghalaya · Central government
Meghalaya reimburses 50% of power service connection charges, capped at Rs 2 lakhs, to micro and small units.
Open, rolling. Applications are accepted continuously — there is no deadline.
Key facts
- Subsidy amount
- Up to ₹2,00,000
- Instrument
- Subsidy
- Deadline
- Rolling
- Disbursement
- Reimbursed after spend
About this scheme
Under Clause 3.4.7.iii.a of the Meghalaya Industrial and Investment Promotion Policy (MIIPP) 2024, Micro and Small Units can claim a subsidy covering 50% of Power Service Connection Charges. Internal wiring is excluded from this benefit, and the amount is capped at Rs 2 lakhs.
This provision sits alongside a separate benefit: units that draw an 11 KV or higher power line to their premises are eligible for 100% reimbursement of that cost.
Who can apply
- Eligible business forms
- Not specified
- MSME categories accepted
- Micro, Small
- Udyam registration
- Not specified
- MSME registration
- Required
- DPIIT startup recognition
- Not required
- GST registration
- Not specified
- Maximum age of business
- 5 years
- Where the business may be based
- Meghalaya
- The unit is a Micro or Small Unit situated in Meghalaya. - A power service connection has been obtained for the unit. - Internal wiring costs do not form part of the eligible amount.
How to apply
1. Get the power service connection for the unit completed in Meghalaya. 2. Retain the invoices, payment receipts and the utility's commissioning or connection documents. 3. Submit the claim to the Commerce and Industries Department via the Invest Meghalaya single window. 4. The amount is disbursed once the department has verified the eligible cost.
How applications are assessed
The Commerce and Industries Department examines each claim under MIIPP 2024, checking it against the eligible cost and the size category of the unit. No competitive selection is involved.
Frequently asked questions
How much is the subsidy?
Power service connection charges are covered at 50%, capped at Rs 2 lakhs.
Is internal wiring covered?
No. Internal wiring is excluded under this clause.
Which units qualify?
Micro and Small Units in Meghalaya.
Can I also claim for drawing the power line?
For drawing an 11 KV or higher line, clause 3.4.7.ii.a provides separate reimbursement of 100% of the cost, subject to a maximum of Rs 10 lakhs.