Meghalaya Captive Power Set Subsidy (Large)

Department of Commerce and Industries, Government of Meghalaya · Central government

Meghalaya funds medium and large units with 50% off captive power sets, up to Rs 50 lakhs conventional and Rs 1 crore renewable.

Open, rolling. Applications are accepted continuously — there is no deadline.

Key facts

Subsidy amount
Up to ₹1,00,00,000
Instrument
Subsidy
Deadline
Rolling
Disbursement
Reimbursed after spend

About this scheme

Under Clause 3.4.7.i.b of the Meghalaya Industrial and Investment Promotion Policy (MIIPP) 2024, Medium and Large Units can claim a subsidy covering half the cost of Power Generating Sets bought for captive energy use. Non-conventional and renewable energy systems fall within the scope of this provision.

Two ceilings apply. Conventional Sets attract a maximum of Rs 50 lakhs, while Non-Conventional or Renewable Energy systems are capped at Rs 1 crore.

Who can apply

Eligible business forms
Not specified
Udyam registration
Not specified
MSME registration
Required
DPIIT startup recognition
Not required
GST registration
Not specified
Maximum age of business
5 years
Where the business may be based
Mizoram

- Unit classified as Medium or Large, situated in Meghalaya - Power generating set procured for captive consumption of energy - Both conventional sets and renewable energy systems are eligible, subject to separate ceilings

How to apply

1. Install and commission the captive power generating set at the unit located in Meghalaya, and complete the purchase. 2. Retain the invoices, payment receipts, and evidence of commissioning or completion. 3. Submit the claim to the Commerce and Industries Department via the Invest Meghalaya single window. 4. The amount is disbursed once the department has verified the eligible cost.

Apply on the issuer's site

How applications are assessed

The Commerce and Industries Department reviews each claim under MIIPP 2024, checking it against the eligible cost and the size category of the unit concerned. No competitive selection process applies.

Frequently asked questions

How much is the subsidy?

Half the project cost is covered, capped at Rs 50 lakhs for conventional sets and Rs 1 crore for non-conventional or renewable energy systems.

Which units qualify?

Medium and Large Units in Meghalaya.

Do renewable systems get more?

Yes. The upper limit for non-conventional and renewable energy systems is twice the amount allowed for conventional sets.

What about micro and small units?

Claims under clause 3.4.7.i.a are subject to ceilings of Rs 10 lakhs and Rs 25 lakhs.

Sectors

  • Meghalaya
  • Captive Power
  • Renewable Energy
  • Miipp 2024
  • Capital Subsidy
  • Manufacturing

Details last verified on 18 September 2026. Source: the issuer's published information.