Meghalaya Power Line Drawl Reimbursement

Department of Commerce and Industries, Government of Meghalaya · Central government

Meghalaya reimburses micro and small units the full cost of drawing an 11 KV or higher power line, capped at Rs 10 lakhs.

Open, rolling. Applications are accepted continuously — there is no deadline.

Key facts

Subsidy amount
Up to ₹10,00,000
Instrument
Subsidy
Deadline
Rolling
Disbursement
Reimbursed after spend

About this scheme

### Clause 3.4.7.ii.a — Power Line Capital Cost Reimbursement

Under Clause 3.4.7.ii.a of the Meghalaya Industrial and Investment Promotion Policy (MIIPP) 2024, Micro and Small Units can claim reimbursement of the full capital cost incurred in drawing an 11 KV and above power line. The transformer cost is covered within this reimbursement. The claim is capped at Rs 10 lakhs.

Where a unit is established at a distance from an existing high-tension line, this provision covers the whole of that one-off connection expenditure, subject to the ceiling.

Who can apply

Eligible business forms
Not specified
MSME categories accepted
Micro, Small
Udyam registration
Not specified
MSME registration
Required
DPIIT startup recognition
Not required
GST registration
Not specified
Maximum age of business
5 years
Where the business may be based
Meghalaya

- The unit must be a Micro or Small Unit situated in Meghalaya. - An 11 KV or higher power line must be drawn to the unit. - The cost of the transformer(s) is counted within the eligible cost.

How to apply

1. Complete the drawl of the 11 KV or higher power line for the unit in Meghalaya. 2. Retain the invoices, payment receipts and the utility's commissioning or connection documents. 3. Submit the claim to the Commerce and Industries Department through the Invest Meghalaya single window. 4. The amount is released once the department has verified the eligible cost.

Apply on the issuer's site

How applications are assessed

The Commerce and Industries Department examines each claim against the eligible cost and the size category of the unit as defined under MIIPP 2024. No competitive selection is involved.

Frequently asked questions

How much is reimbursed?

The full cost of drawing an 11 KV or higher power line, transformers included, is covered, up to a ceiling of Rs 10 lakhs.

Are transformers covered?

Yes, the cost of the transformer(s) is explicitly covered under this clause.

Does a lower-voltage line qualify?

The clause names 11 KV and above.

Which units qualify?

Micro and Small Units in Meghalaya.

Sectors

  • Meghalaya
  • Power Infrastructure
  • Electricity Connection
  • Msme
  • Miipp 2024
  • Reimbursement

Details last verified on 1 November 2026. Source: the issuer's published information.