Meghalaya Power Line Drawl Reimbursement
Department of Commerce and Industries, Government of Meghalaya · Central government
Meghalaya's power line reimbursement funds micro and small units 100% of 11 KV or higher line costs, capped at Rs 10 lakhs.
Open, rolling. Applications are accepted continuously — there is no deadline.
Key facts
- Subsidy amount
- Up to ₹10,00,000
- Instrument
- Subsidy
- Deadline
- Rolling
- Disbursement
- Reimbursed after spend
About this scheme
Under Clause 3.4.7.ii.a of the Meghalaya Industrial and Investment Promotion Policy (MIIPP) 2024, Micro and Small Units can claim full reimbursement of the capital cost involved in drawing an 11 KV and above power line. The cost of transformers is covered under this provision as well. Reimbursement is capped at Rs 10 lakhs.
Where a unit is being established at a location removed from an existing high-tension line, this provision absorbs the whole of that connection expenditure, up to the stated ceiling — one of the heavier one-time costs a new unit would otherwise bear.
Who can apply
- Eligible business forms
- Not specified
- Udyam registration
- Not specified
- MSME registration
- Required
- DPIIT startup recognition
- Not required
- GST registration
- Not specified
- Maximum age of business
- 5 years
- Where the business may be based
- Mizoram
- Unit must be a Micro or Small Unit situated in Meghalaya - An 11 KV or higher power line must be drawn to the unit - The eligible cost includes the cost of transformer(s)
How to apply
1. Finish drawing the 11 KV or higher power line for the unit in Meghalaya. 2. Retain invoices, payment receipts, and the utility's commissioning or connection documents. 3. Submit the claim to the Commerce and Industries Department via the Invest Meghalaya single window. 4. The amount is disbursed once the department has verified the eligible cost.
How applications are assessed
The Commerce and Industries Department reviews each claim under MIIPP 2024, checking it against the eligible cost and the size category of the unit concerned. No competitive selection process applies.
Frequently asked questions
How much is reimbursed?
The scheme covers the entire cost of drawing an 11 KV or higher power line, transformers included, up to a ceiling of Rs 10 lakhs.
Are transformers covered?
Yes, the cost of transformer(s) is explicitly covered under this clause.
Does a lower-voltage line qualify?
The clause names 11 KV and above.
Which units qualify?
Micro and Small Units in Meghalaya.
Sectors
- Meghalaya
- Power Infrastructure
- Electricity Connection
- Msme
- Miipp 2024
- Reimbursement
Details last verified on 18 September 2026. Source: the issuer's published information.